How do I use mapecem?

How do I use mapecem?

Mapecem Quickpatch can be installed from featheredge to 3″ (7,5 cm) neat in confined areas. Mapecem Quickpatch can be primed and covered with a leveler, MAPEI’s Concrete Renew™ or another topping in as little as 30 minutes depending on temperature.

What is Quickpatch?

Mapecem Quickpatch ® is a versatile, fast-setting, cementitious material used for the patching of interior/exterior concrete surfaces including concrete floors, driveways, sidewalks, and concrete pads. Mapecem Quickpatch features extraordinary ease of placement, with a variable water ratio and outstanding workability.

What is mapecem?

DESCRIPTION. Mapecem Premix is a fast-setting, premixed cement-based mortar for concrete repairs and subfloor preparation work. Mixed exclusively with water, Mapecem Premix provides an easy-to-use, high-compressive-strength, fast-setting mortar that sets completely within 24 hours without shrinkage cracks.

Do you need primer for Planipatch?

Can I use Planipatch® over plywood? MAPEI’s Planipatch can be applied directly over clean, exterior-grade plywood. No additive or primer is required.

How long does it take Planipatch to dry?

Allow at least 60 minutes to dry; thicker applications may require longer drying times before the application of flooring adhesives.

How do you mix Planipatch?

Into a clean mixing container, pour 1 part liquid (A, B or C). Gradually add 2-1/2 to 3 parts Planipatch powder by volume while slowly mixing. Note: Water temperature should not exceed 73°F (23°C). Higher water temperature will shorten pot life.

Is Mapei Planipatch self leveling?

Enter MAPEI’s persistence in coming up with innovative, high-performing products that make the installer’s job easier. MAPEI now offers a self-leveling underlayment that streamlines the installation, and doesn’t compromise on bond, durability or the smoothness of its surface.

How long does Planipatch take to cure?

Allow at least 60 minutes to dry; thicker applications may require longer drying times before the application of flooring adhesives. Clean tools and equipment with water while product is still wet/fresh. Use mechanical means to remove cured product.

What do you use to fill small holes in concrete floor?

If you can’t find premixed concrete patch, you can make your own by mixing one part cement to 2.5 parts fine sand. To fill holes deeper then 1/4 inch, apply at least two layers of the cement patch. To make sure the patch sets properly, cover it with plastic sheeting for about five days.

Can you fix concrete after it dries?

Rain can pit concrete that is still drying and cause scaling. As concrete dries, one of the worst things that can happen is for rain to start falling. Most damage done to concrete by rain can be fixed by removing the affected layer with specialized tools.

Is Mapei Planipatch self-leveling?