Users' questions

Is Melamchi project completed?

Is Melamchi project completed?

All remaining works especially for permanent headwork structures estimated to be completed by end of Q1 2020. Construction of main access road was completed and opened up between Melamchi Pul Bazar and Timbu….Project Data Sheet.

Timetable
Last Review Mission
PDS Creation Date 12 Feb 2007
Last PDS Update 03 Dec 2020

What kind of project is Melamchi drinking water?

The Melamchi Water Supply Project (MWSP) is considered to be the most viable long-term alternative to ease the chronic water shortage situation within the Kathmandu Valley. The Project is designed to divert about 170 MLD of fresh water to Kathmandu Valley from the Melamchi River in Sindhupalchowk district.

Who started Melamchi water supply project?

the government of Nepal
Melamchi Water Supply Development Board (MWSDB) has been established by the government of Nepal in November 9, 1998 (2055/7/23 BS) as an implementing agency of Melamchi water supply project.

Can we drink Melamchi water?

KUKL has urged people not to drink Melamchi water during the testing phase, as it might be contaminated due to newly inaugurated water tunnels and water pipes. Funded mainly by the Asian Development Bank, Japan, OPEC, JICA, and the government of Nepal, MDWP has seen many ups and downs in the course of its execution.

Who are benefited from the Melamchi Water Supply Project?

The primary objective of the project is to alleviate chronic shortage of potable water in the Kathmandu Valley with reliable, affordable, consumer-oriented and sustainable supply to 1.5 million people in 180,000 households and thereby improve health and welfare of the residents, particularly of the poor.

Will the problem of drinking water in Kathmandu Valley be solved after the completion of Melamchi project?

Project Aftermath It is estimated that upon project completion and with the required infrastructure, treatment methods, and distribution capacity, Kathmandu Valley will have no water deficit by 2023–2025 (Udmale et al. 2016).

What are the benefits of Melamchi Drinking water project?

Who are benefited from the Melamchi water supply project?

Why is Melamchi drinking water project important for Kathmandu Valley?

To provide a reliable, affordable, consumer-oriented and sustainable potable water supply and sanitation services in the Kathmandu Valley. The raw water from Melamchi, Sindhupalchowk is being diverted from the site through the construction of headworks diversion tunnel and temporary cofferdams.

How can we solve the problem of drinking water?

Amazing Solutions to Water Scarcity

  1. Save Water Whenever Possible.
  2. Education.
  3. Recycle Water.
  4. Advance Technology Related to Water Conservation.
  5. Improve Practices Related to Farming.
  6. Less Use of Chemicals in Farming.
  7. Improve Sewage Systems.
  8. Better Water Distribution Infrastructure.

What does drinking water do to your body?

Drinking Water Helps Maintain the Balance of Body Fluids. The functions of these bodily fluids include digestion, absorption, circulation, creation of saliva, transportation of nutrients, and maintenance of body temperature.

What’s the altitude of Kathmandu?

1,400 m
Kathmandu/Elevation

Kathmandu, also spelled Katmandu or Kantipur, capital of Nepal. It lies in a hilly region near the confluence of the Baghmati and Vishnumati rivers, at an elevation of 4,344 feet (1,324 metres) above sea level. It was founded in 723 by Raja Gunakamadeva.

What was the population of Melamchi in 1991?

At the time of the 1991 Nepal census it had a population of 3936 and had 710 houses in the village. Government of Nepal has initiated a drinking water project called Melamchi water supply project to Kathmandu Valley. The Melamchi Valley is typically narrow, steep Himalayan River-Valley.

What are the main objectives of the Melamchi project?

The main objectives of the Project are to alleviate the chronic water shortage in Kathmandu Valley on a sustainable, long-term basis, and to improve the health and well-being of its inhabitants.

Where does Melamchi water supply project get its water?

WTP is 100% completed and trial run started utilizing water from nearby Bagmati river.Resettlement Plans and Environmental Management Plan (EMP) were prepared and are under implementation for both Subproject 1 and 2 following the split into two distinct subprojects in 2009.

Who is the main agency for Melamchi subproject 1?

MWSDB is continuously monitoring the activities to ensure compliance. MWSDB is the main agency for project management of Melamchi Subproject 1 (Melamchi tunnel construction). Inputs of project management consultant finished. MWSDB is supported by new design and supervision consultant (DSC).