DO-178B is a software produced by Radio Technical Commission of Aeronautics Inc. (RTCA), used for guidance related to Equipment certification and software consideration in airborne systems. It is a corporate standard, acknowledged worldwide for regulating safety in the integration of aircraft systems software.

DO-178B testing guidelines?

DO-178C Table A.6 Testing Outputs of Integration Process

  • Executable Object code complies with high level requirements.
  • Executable Object Code is robust with high-level requirements.
  • Executable Object code complies with low level requirements.
  • Executable Object code complies with low level requirements.

What does RTCA DO stand for?

the Radio Technical Commission for Aeronautics
RTCA is a private, not-for-profit association founded in 1935 as the Radio Technical Commission for Aeronautics, now referred to simply as “RTCA”.

DO-178B codes standard?

Developed by RTCA and EUROCAE, DO-178B defines the guidelines for development of aviation software in both the US and Europe and is being increasingly adopted by other related sectors, such as air traffic control and military applications. …

DO-178B artifacts?

DO-178B requires a thorough definition and documentation of the software development process. The base set of required documentation and life cycle artifacts include: Plan for Software Aspects of Certification (PSAC) Software Quality Assurance Plan.

Do software standards do 278?

DO-278A is a strong guideline comprising both recommendations and assessable objectives. It is intended for use in developing ground-based systems (containing software) which are involved with aircraft operations. No, and that’s why DO-278A is informally referred to as the aviation standard for ground-based systems.

What is V model in testing?

The V-model is an SDLC model where execution of processes happens in a sequential manner in a V-shape. It is also known as Verification and Validation model. The V-Model is an extension of the waterfall model and is based on the association of a testing phase for each corresponding development stage.

What is LDRA tool?

The LDRA tool suite helps you build quality into your software development life-cycle. The LDRA tool suite’s open and extensible platform is unique in its integration of software life-cycle traceability, static and dynamic analysis, unit test and system-level testing on virtually any host or target platform.

Do RTCA DO 254?

RTCA/DO-254 distinguishes between complex and simple electronic hardware; recognizes five classes of failure conditions, from catastrophic to no effect; and provides guidance for each hardware design assurance level associated with a given failure condition classification.

Is 333 a formal method?

DO-333, Formal Methods Supplement to DO-178C and DO-278A, is a 118-page guideline governing Formal Methods usage in airborne and ground-based aviation software. Interestingly, this “Formal Methods” supplement DO-333 has been called the Voodoo Zen Master bible within avionics development.

What is PSAC do178b?

What is the purpose of DO-178C PSAC document? PSAC document is mainly used to describe the system overview, Software characteristics, certification considerations, life cycles and life cycles data, and software development schedule. This is document is used by both certification authority and the applicant.

What is the DO-178B data and control coupling objective?

Abstract-The DO-178B/C is a guidance accepted by the certification authorities for aeronautical software. It includes objectives to be met by applicants, one of them being the Data and Control Coupling objective, whose purpose is to provide a measurement and assurance of the correctness of software components interactions and dependencies.

What’s the difference between DO-178C and do 178B glossary?

DO-178B’s imprecise technology had consistent issues with the use of words, including, but not limited to, “guidance,” “purpose,” “goals,” and “objective.” These terms were clarified in the DO-178C glossary to ensure correct and consistent utilization.

When did DO-178B / ED-12B become acceptable?

Since 1992, the aviation industry and certification authorities around the world have used the considerations in DO-178B/ED-12B as an acceptable means of compliance for software approval in the certification of airborne systems and equipment.

What are the goals and objectives of PE?

Goals and Objectives Bank Basic Reading Reading Comprehension Math Calculations Math Reasoning Oral Expression Listening Comprehension Written Expression Speech/Language Behavior/Social Skills Extended Standards/ Life Skills Functional Academics Adaptive PE Occupational Therapy Physical Therapy Basic Reading (Back) K-3 4-6 7-8 9-12