Articles

How many stations are there in Kochi Metro?

How many stations are there in Kochi Metro?

This is a list of stations of the Kochi Metro. There are 25 stations planned on the line from Aluva to Tripunithura railway station 22 of them are currently in operation, Petta Metro Station is the most recent opened station on 21-July-2020.

Is vytilla metro station open?

Vyttila metro station is a metro station of Kochi Metro….

Vyttila metro station
Opened 4 September 2019
Services
Preceding station Kochi Metro Following station Elamkulam toward Aluva Line 1 Thaikoodam toward Pettah
show Route map

How many metro stations are there in Kerala?

Currently, the line measures 23.8 km and it has 21 stations. The line uses 750 V direct current supplied via third rail and 1435 mm (standard gauge) tracks.

Where does Kochi Metro start?

Kochi Metro is a proposed rapid transit system for the city of Kochi in Kerala, India. The 25.612km metro line will run from Aluva to Petta and will include 22 stations. The metro rail project is also known as Komet or K-3C.

What is the salary of Delhi Metro driver?

Loco Pilot salary in Delhi Metro Rail Corporation ranges between ₹ 9 Lakhs to ₹ 11.5 Lakhs.

Is Ernakulam a metro city?

The Kochi metropolitan area or Kochi urban agglomeration is a metropolitan area centered around the city of Kochi, in Ernakulam district, Kerala, India….

Kochi Metropolitan Area
State Kerala
District Ernakulam
Area
• Total 440 km2 (170 sq mi)

Is Kochi Metro running Sunday?

According to Kochi Metro Rail Limited (KMRL), from July 19, trains will run from 7 am to 9 pm on weekdays and from 8 am to 8 pm on weekend days. On Saturdays and Sundays, the frequency of the trains will be 30 minutes.

Which metro station is near to kakkanad?

Nearest Metro Station to Kakkanad Kochi

Sr No. Metro Station Name Distance
1 Palarivattom Metro Station 1 Km
2 Changampuzha Park Metro Station 2 Km
3 Edapally Metro Station 2 Km
4 JLN Stadium Metro Station 2 Km

Which is the first metro city in Kerala?

Thiruvananthapuram Metro

Overview
Native name TMC
Owner Rapid Transit
Locale Thiruvananthapuram, Kerala, India
Transit type Rapid Transit

Who is behind Kochi Metro?

In July 2017, a consortium of Cherian Varkey Construction Company (CVCC) and Vijay Nirman Constructions (VNC) has been awarded the contract to execute the construction of Kochi Metro works from Maharaja’s College to Ernakulam south, and also from Kunnara Park to Pettah.

What is the salary of Metro pilot?

Bangalore Metro Rail Corporation Station Controller Train Operator Salaries in India. Station Controller Train Operator salary in Bangalore Metro Rail Corporation ranges between ₹ 6.5 Lakhs to ₹ 8.3 Lakhs.

Which is the second phase of Kochi Metro?

The second phase of Kochi Metro will connect Kochi with 25 stations from Aluva to Petta via MG Road. The Second phase of Metro service is up to 6 stations and reaches Maharaja’s College. Currently metro service touches 21 stations, between Aluva and Thaikkoodam. All Kochi Metro stations are elevated stations.

What is the minimum fare for Kochi Metro?

Kochi Metro is likely to available for every 7 minutes from 6 AM in the morning until 10 PM in the night. The minimum fare for Kochi Metro is fixed at Rs.10 for first two km and the maximum fare would be Rs. 40 up to 13 Km (Aluva – Palarivattom).

Who is the zonal contractor for Kochi Metro Rail?

Selection of Zonal Contractor for Civil and Allied Works from Aluva to Maharajas College Metro station of Kochi Metro Rail Ltd Selection of Insurance company for Group Mediclaim Group Personal Accident Policy for Employees of Kochi Metro Rail Ltd KMRL for the Proposed Policy Period 01-08-2020 to 31-07- 2021

Which is the tallest metro station in Kochi?

Operational Sr No Station Name Station Name Opened Height of Rail Level English Malayalam 1 Aluva † ആലുവ 19 June 2017 12.5 m 2 Pulinchodu പുളിഞ്ചോട് 19 June 2017 12.5 m 3 Companypady കമ്പനി പടി 19 June 2017 12.5 m