Popular tips

What does it mean to be at Camp Lejeune?

What does it mean to be at Camp Lejeune?

Camp Lejeune is a training base that promotes the combat readiness of the operating forces and missions of other tenant commands by providing training venues, facilities, services, and support in order to be responsive to the needs of Marines, sailors, and their families. Camp Lejeune, N.C.

When is the day long power outage at Camp Lejeune?

A day-long outage will also take place on Saturday, June 6 from 7:00 a.m. until 6:00 p.m. or the work is complete. These outages are required to transfer power lines to a new upgraded substation in coordination with Duke Energy.

Are there any cases of covid-19 at Camp Lejeune?

The ONE confirmed case of COVID-19 aboard Camp Lejeune has recovered and been medically cleared. While there is no indication of widespread outbreak in Onslow County, community transmission has been seen in greater numbers in other counties in North Carolina to include Durham, Mecklenburg, and Wake Counties. As a preventative measure]

Where is Duke Energy substation in Camp Lejeune?

Some areas will be restored later than others as the substation is brought back online. The main substation that feeds power from Duke Energy to Paradise Point, Berkeley Manor, Midway Park, Heroes Manor, Watkins Grove, Watkins Village, Hospital Point and the 100-area buildings between “A” and Cross Streets continues to be down at this time.

When to wear face covering at Camp Lejeune?

BY ORDER OF THE COMMANDING GENERAL, MCIEAST-MCB CAMP LEJEUNE: Effective at 8 a.m., Friday, April 10, all individuals aboard MCIEAST installations will carry a face covering when entering any base activity. Wear appropriate face covering to conduct business during occasions where you cannot maintain at least six feet of social distancing.

When does power return to Camp Lejeune NC?

Camp Lejeune, N.C. – The second of three Marine Corps network battalions was activated today on As power restoration efforts continue, repairs to the damaged equipment have just been completed, and crews estimate that power will begin to be restored at approximately 5 p.m.