Guidelines

What are the stops on the 7 train?

What are the stops on the 7 train?

Direction: Manhattan (22 stops)

  • Flushing – Main St [7x,7] Main Street, Queens View full schedule.
  • Mets – Willets Point [7x,7] View full schedule.
  • 111 St [7]
  • 103 St – Corona Plaza [7]
  • Junction Blvd [7x,7]
  • 90 St – Elmhurst Av [7]
  • 82 St – Jackson Hts [7]
  • Jackson Hts – Roosevelt Av – 74 St [E,F,M,R,7]

How long is the Hudson Yards subway escalator?

The platform, at 585 feet (178 m) long, is among the longest in the IRT system, as well as the longest “column-free” platform of any station in the system.

Can you get the 7 train from Penn Station?

The 7 train goes directly from Manhattan to Mets-Willets Point station. Transfer to the 7 from Penn Station by taking the 1, 2 or 3 subway line one stop north to Times Square. Purchase a MetroCard at one of the vending machines in the station. A one-way subway ride costs $2.75.

What subway stop is Hudson Yards?

No. 7 Subway
The No. 7 Subway is the main conduit to and from Hudson Yards. It connects to Times Square and beyond from an eye-catching new station, located steps from the east lobby across Hudson Park. The M34-SBS, M12 & M11 bus lines stop near the building.

How often is 7 train?

7 trains operate between Flushing- Main St, Queens, and 34 St- Hudson Yards, Manhattan, at all times. Weekday mornings some 7 trains (denoted below by a color bar) operate express toward Manhattan. Weekday afternoons and evenings, these trains operate express to Queens. Train always operates and always stops here.

When does the 7 train to Hudson Yards open?

On September 13, You Can Ride the 7 Train to Hudson Yards. 7 Train Extension Is ‘Pretty Much Complete,’ Will Open in Sept. Take a Ride on the Long-Delayed 7 Train Extension. MTA unveils $51.5 billion plan to fix New York City’s transit system The investment would amount to the largest in the agency’s history.

Where does the 7 train run in NYC?

7 and [7X] trains run between Flushing-Main St and 34 St-Hudson Yards. Compare the average uptime of the 7 subway line with the average uptime of all subway lines. Uptime is considered when the train is in Good Service . The 7 Train reported Weekday Service for 88 % of the day, No Scheduled Service for 11 % of the day, Delays for 1 % of the day.

Where is the Hudson Yards train station located?

The station directly serves the Hudson Yards mega-development above it, and is located within the greater Hudson Yards neighborhood. The station contains two entrances along Hudson Boulevard: a primary entrance south of 34th Street, and a secondary entrance south of 35th Street.

What was the cost of the 7 train extension?

In October 2007, the Metropolitan Transportation Authority (MTA) awarded a $1.145 billion contract to build 7,000 feet (2,100 m) of twin-tube tunnel from the 7 train’s then-terminus at Times Square to the then-planned shell of the 34th Street–Hudson Yards station.