How many metro are there in Bangalore?
How many metro are there in Bangalore?
Phase 2, 2A, and 2B lines and sections
Line | Terminals | New stations |
---|---|---|
Pink Line | Kalena Agrahara (previously Gottigere) – Nagawara | 18 |
Blue Line | Central Silk Board – KR Puram | 13 |
Blue Line | KR Puram – Kempegowda International Airport | 17* |
Total (Phase-2, 2A, 2B) : | 91 |
Is metro available in Bangalore?
Is Metro available in Bangalore tomorrow? Due to lockdown, Bangalore’s Namma Metro service is available during from 8:00 AM to 11:00 AM and 4:30 PM to 6:30 PM (Monday to Friday and 1st and 3rd Saturdays) and from 10:00 AM to 12:00 PM and 5:00 PM to 7:00 PM (Sundays, General Holidays, 2nd and 4th Saturdays).
Which is the last metro station in Bangalore?
Bangalore Metro Lines
Metro Line | Length (Km) | Starting Point – End Point |
---|---|---|
Purple | 18.2 | Baiyappanahalli – Mysore Road |
Green | 24.2 | Nagasandra – Yelachenahalli |
Is Bangalore Metro underground?
Bangalore (Metro Rail News): Bengaluru Metro Rail Corporation Limited (BMRCL) also known as Namma metro has begun its tunnelling work for the city’s underground Metro section. Now the machines have been placed in the underground Corridor of the Nagawara-Gottigere Line of (Reach-6) of Metro’s Phase-II.
Which is the underground metro station in Bangalore?
City Railway Station is an underground metro station on the Purple Line of the Namma Metro serving Subhash Nagar, Sevashrama, Bangalore. It was opened to the public on 30 April 2016.
Which is the electrified railway station in Bangalore?
The Bangalore- Mysore line is also doubled and electrified. The railway station is served by City Railway Station metro station on the Namma Metro ‘s Purple Line, which opened on 30 April 2016.
Which is the local public transportation in Bangalore?
Metro is local public transportation in Bangalore city its provide service in totally 13 cities important place and Metro track will be extended year by year which is construct and controlled by Bangalore Metro Rail Corporation Ltd (BMRCL). Bangalore Metro Stations list and map fo metro. Table of Contents.
When did the metro service start in Bangalore?
On weekdays metro runs from 05:30 to 23:00. On weekends service time may vary. System began operation in in October 2011.