Line-1 – Red Line: Miyapur – BHEL – Patancheru (13 km) Line-3 – Blue Line: Nagole – LB Nagar – Falaknuma – Shamshabad Airport (28 km) Line-3 – Blue Line: Raidurg – Gachibowli – Shamshabad Airport (30.7 km)

Which metro station is near to Shamshabad airport?

Nearest Metro Station to Shamshabad Hyderabad

Sr No. Metro Station Name Layout
1 Falaknuma Metro Station on-ground
2 Shamshergunj Metro Station Elevated
3 Shalibanda Metro Station Elevated
4 Charminar Metro Station Elevated

Which is the first phase of MMTS in Hyderabad?

HMDA planned for future phases for developing and expansion of MMTS to all routes of railways line in Hyderabad in Master Plan 2041 In May 2010, Indian Railways decided to take up the 107-km Phase-II project of the MMTS at an estimated cost of Rs. 641 crore.

Which is the route of MMTS Phase II?

The 84-km MMTS Phase-II entails (Moulali-Ghatkesar, Moulali – Sanathnagar – Tellapur – Ramachandrapuram, Medchal – Bolarum – Secunderabad and Falaknuma – Umdanagar – Shamshabad Airport). SCR states that the State government owes about ₹450 crore towards its share of the project whereas it had spent ₹580 crore already, more than its one-third share.

Which is the route of Hyderabad Metro Phase 2?

Hyderabad Metro Rail Phase-2 expansion plan is for about 85 km, which includes providing a link to Shamshabad RGI Airport. The proposed routes are as following: Line-1 Extension – Red – Miyapur – BHEL – Patancheru – 15 km (9.3 mi) Line-3 Extension – Blue – Nagole-LB Nagar-Falaknuma-Shamshabad RGI Airport – 28km (17mi)

Which is the second phase of Hyderabad Multi Modal Transport System?

The second phase was opened by N.Chandrababu Naidu, chief minister of Andhra Pradesh. The system has three lines, with total length of 44 kilometres (27 mi). In May, 2010, Indian Railways decided to take over the 107-kilometre (66 mi) Phase II project at an estimated cost of ₹ 641 crore.